Formula applied
The exact method behind this answer
CalculationTime keeps the method visible so the number can be checked instead of blindly trusted.
Plan area = plan length × plan width. Slope factor = 1 ÷ cos(pitch angle). Sloped roof area = plan area × slope factor. Order area = sloped roof area × (1 + waste percent ÷ 100). Packs = ceiling(order area ÷ coverage per pack).- Apply the formulaPlan area = plan length × plan width. Slope factor = 1 ÷ cos(pitch angle). Sloped roof area = plan area × slope factor. Order area = sloped roof area × (1 + waste percent ÷ 100). Packs = ceiling(order area ÷ coverage per pack).66.2 m²order area 72.82 m² · 25 packs