Formula applied
The exact method behind this answer
CalculationTime keeps the method visible so the number can be checked instead of blindly trusted.
Depth feet = excavation depth inches ÷ 12. Bank cubic feet = length feet × width feet × depth feet × number of sections. Bank cubic yards = bank cubic feet ÷ 27. Bank cubic metres = bank cubic yards × 0.764554857984. Loose spoil cubic yards = bank cubic yards × (1 + swell percent ÷ 100). Truckloads = ceiling(loose spoil cubic yards ÷ truck capacity cubic yards). Cost estimate = loose spoil cubic yards × rate per cubic yard.- Apply the formulaDepth feet = excavation depth inches ÷ 12. Bank cubic feet = length feet × width feet × depth feet × number of sections. Bank cubic yards = bank cubic feet ÷ 27. Bank cubic metres = bank cubic yards × 0.764554857984. Loose spoil cubic yards = bank cubic yards × (1 + swell percent ÷ 100). Truckloads = ceiling(loose spoil cubic yards ÷ truck capacity cubic yards). Cost estimate = loose spoil cubic yards × rate per cubic yard.20 yd³15.29 m³ bank · 25 yd³ loose spoil · 3 truckloads · $875